Prospek Pemanfaatan Pembangkit Listrik Tenaga Air (PLTA) Skala Besar

April 23, 2010 pukul 1:51 pm | Ditulis dalam Technical Note | Tinggalkan komentar

Agus Sugiyono, Prospek Pemanfaatan Pembangkit Listrik Tenaga Air (PLTA) Skala Besar Mamberamo I, Mamberamo II, dan Edi Vallen di Irian Jaya, Laporan Teknik, BPPT, Pebruari 1999.

Abstrak
Mamberamo River in Irian Jaya have abundant hydroelectric potential with installed capacity is about 12,284 MW. Preliminary study show that 3 locations : Mamberamo I, Mamberamo II, and Edi Vallen have potential to be developed at the early stages if energy intensive industries were also developed in this region. Utilization of big scale hydroelectric power in Mamberamo River need to analyze all of the development aspects.


Donation


If you feel that this paper is valuable for you, please give donation to:
Agus Sugiyono
Bank Bukopin – Kebayoran Baru Branch
Jl. R.S. Fatmawati No. 7, Jakarta, INDONESIA
Account No. 070-100-7743
Bank Code: 441
SWIFT Code: BBUKIDJA
It will support our future research. Thank you very much.


<Download full report>

Iklan

Tinggalkan sebuah Komentar »

RSS feed for comments on this post. TrackBack URI

Tinggalkan Balasan

Isikan data di bawah atau klik salah satu ikon untuk log in:

Logo WordPress.com

You are commenting using your WordPress.com account. Logout / Ubah )

Gambar Twitter

You are commenting using your Twitter account. Logout / Ubah )

Foto Facebook

You are commenting using your Facebook account. Logout / Ubah )

Foto Google+

You are commenting using your Google+ account. Logout / Ubah )

Connecting to %s

Buat situs web atau blog gratis di WordPress.com.
Entries dan komentar feeds.

%d blogger menyukai ini: