Kebutuhan dan Penyediaan Energi di Industri Smelter Tembaga

April 7, 2014 pukul 9:59 am | Ditulis dalam Paper | Tinggalkan komentar

Agus Sugiyono, Kebutuhan dan Penyediaan Energi di Industri Smelter Tembaga, Prosiding Seminar dan Peluncuran Buku Outlook Energi Indonesia 2013, hal. 50-56, ISBN 978-602-1328-00-2, PTPSE-BPPT, Jakarta, 24 Januari 2014.

Abstract

Law No. 4 of 2009 on mineral and coal has pushed Indonesia to implement the advancement mineral’s value-added in the country, particularly for copper. Indonesian has copper reserves of 28 million metric tons that is enough to produce for the long term. In addition, PT Smelting now can process only one-third of the copper concentrate supply from PT Freeport Indonesia and PT Newmont Nusa Tenggara, therefore there is an opportunity to process copper concentrate in the country. Assuming that in 2015 the country will require new smelter industry with a production capacity of 350 thousand tons per year, in consequence the energy requirement for copper smelter industry will increase from currently at 0.50 million BOE to 1.08 million BOE in 2015. The power plant needed for the new smelter industry will have an installed capacity of 58.4 MW that supplied using gas turbine power plant.

<Download full paper>

Tinggalkan sebuah Komentar »

RSS feed for comments on this post. TrackBack URI

Tinggalkan Balasan

Isikan data di bawah atau klik salah satu ikon untuk log in:

Logo WordPress.com

You are commenting using your WordPress.com account. Logout / Ubah )

Gambar Twitter

You are commenting using your Twitter account. Logout / Ubah )

Foto Facebook

You are commenting using your Facebook account. Logout / Ubah )

Foto Google+

You are commenting using your Google+ account. Logout / Ubah )

Connecting to %s

Buat situs web atau blog gratis di WordPress.com.
Entries dan komentar feeds.

%d blogger menyukai ini: